Warning: opendir(/data/web/virtuals/289878/virtual/www/wp-content/cache/db/options//5e5/bb4): failed to open dir: No such file or directory in /data/web/virtuals/289878/virtual/www/wp-content/plugins/w3-total-cache/Util_File.php on line 158
First installation of the car chassis crossbeams - FlowTech

First installation of the car chassis crossbeams

  •       Universal fixture for the fitting and welding of 13 types of railway car bogies
  •       JUS conversion for every crossbeam type is carried out on the control panel via pre-programmed recipes
  •       The conversion time is up to 5 seconds
  •       Own hydraulic unit
  •       PLC control

Contact us

If you are interested in cooperation, do not hesitate to contact us.